SmartAlec wrote:
Yes, but isn't one day pushing it a bit for all those machines to be dispatched?
Eyetech are expecting them on 20th, so on the 20th...they have to arrive, be tested, and posted!
Who actually said they were expecting them on the 20th and were shipping on the 20th ?
What i said was they are expecting them this week!
16th,17th,18th,19th 20th !!!! thats this week.
And hope to get them out by the end of the week. Then end of the week being the 20th!!!
What makes you think that they have not already had a burn-in in the factory before they are dispatched to eyetech.
The board does appear to have have quite a few logic testing points / pins on it on it
If your that worried give them a ring.
http://amiga.org/gallery/photo.php?lid=178