JurassicCamper wrote:
Well if it is done, I stand corrected, but answer me this then why did the A1-XE G4s not ship on the 24 Feb 2003
I beleive the shipping date of the 24th was from the Taiwan factory, not to users. The 28th was the date Eyetech could have received the board by.
Eyetech also said these were estimated dates.