There are even over 1.3 billion Indians now :lol:
means even more can do the connectors. JK
I think the biggest problem with the Vampires is the waitlist.
I once asked KEL to send me some samples as I needed to adapt a CS MKI to fit in an eagle tower for a research project, and I got 10 samples, just like that.
even if one can source 1000 of the connectors it will take over a year to make them all at the current production rate.
Still waiting for my Vampire 600
