Welcome, Guest. Please login or register.

Author Topic: Public Release of MorphOS 2.5 & Introduction of eMac Support  (Read 15125 times)

Description:

0 Members and 1 Guest are viewing this topic.

Offline Britelite

  • Full Member
  • ***
  • Join Date: Jul 2003
  • Posts: 187
    • Show all replies
    • http://www.dekadence64.org
Quote from: XDelusion;562801
So assuming I was doing modeling (which I'm not), I'd be able to render images within a few seconds/minutes instead of hours?


Probably depends on how long it takes for example on a 68060. If it takes 24h on a 060, I doubt it'll finish in a few seconds with JIT ;)  But it will still speed up considerably.