some news from the production site:
I've been a little nervous about the first dual-sided production run on the new machines (new since 2008), but it was all going flawlessly so far. Backsides have been assembled last week, and we're now tweaking the machines for the other side. If all goes as planned, the manual assembly (DIP sockets, jumper and VGA connector) can start next week.
Time to place your pre-orders!
Jens